Description
Construction on Changchun Light Rail Line 4 started in April 2009. The line includes 16 stations and has a total length of around 16 kilometres.
Solution
Rail dampers have been installed to reduce the N&V impact on residential buildings, hospitals and schools in the section along Linhe Street. Measurements show vibration mitigation even at frequencies between 31.5Hz and 80Hz.
EPDM, Steel
Material
70 km/h
Design speed
2015/3 – V2015/5
Installation
Viaduct
Structure type
2.8 km
Installed lenght
Rail Damper
Product details
Zhejiang Tiantie Industry Co., Ltd.
No. 928, Renmin East Road
Tiantai (317200)
Taizhou, Zhejiang, China
Phone 0086-(0)576 8317 1283
Fax 0086-(0)576 -8308 6288
Email info@tiantiegroup.com
International Business Office
Email info@tiantiegroup.com