Description
Nanchang Metro Line 1, the first subway line in Nanchang, Jiangxi Province, China has a total length of approx. 28. kilometres. The entire Metro line and its 24 stations are underground.
Solution
More than 140 sites were detected as sensitive areas in terms of ground-borne noise and vibration. A request was made for the installation of FST on highly resilient track mats. Tiantie delivered the track mat USM 1000 W with a very low stiffness to meet the required mitigation measures. Approval measurements have shown an efficiency of 19 dB in higher 1/3 octave bands.
NR, CR, SBR
Material
80 km/h
Design speed
2014/9 – 2015/1
Installation
Bored tunnel
Tunnel type
14 T
Axle load
520 m
Installed length
USM 1000W
USM 2030
Product details
Zhejiang Tiantie Industry Co., Ltd.
No. 928, Renmin East Road
Tiantai (317200)
Taizhou, Zhejiang, China
Phone 0086-(0)576 8317 1283
Fax 0086-(0)576 -8308 6288
Email info@tiantiegroup.com
International Business Office
Email info@tiantiegroup.com